Hoover Dam Bypass Bridge | TYLin Group

Skip to main content hoover dam

TYLin led the design of the landmark Hoover Dam Bypass Bridge (Mike O’Callaghan-Pat Tillman Memorial Bridge) across the Black Canyon between the states of Arizona and Nevada.

The bridge is located 1,500 feet downstream of the Hoover Dam, one of the foremost engineering wonders of the world.

At 1,900 feet long, with a 1060-foot-long main span, the Hoover Dam Bypass Bridge opened to traffic as the highest and longest single-span concrete arch bridge in the Western Hemisphere.

The spectacular setting for the bridge also proved to be its greatest design and construction challenge. The Black Canyon below the dam is a formidable, 890-foot-deep gorge with dramatic rock cliffs, steep canyon walls, and a vast geological palette.

TYLin designed the Hoover Dam Bypass Bridge as a unique concrete-steel hybrid, the first of its kind in the U.S. The twin-ribbed arch supports the tallest precast, segmental concrete columns in the world.

The Hoover Dam Bypass Bridge benefits the local economy by significantly reducing travel congestion for millions of motorists and restoring a critical North American Free Trade Agreement (NAFTA) trade route for close to 2,000 trucks per day. The project also ensures safer and faster travel on U.S. 93 and helps to protect the iconic Hoover Dam.

Project Highlights:

  • The bridge was the centerpiece of the four-lane Hoover Dam Bypass Project, which included 1.2 miles of approach roadway in Arizona and 2.3 miles of roadway in Nevada.
  • TYLin’s design for the innovative hybrid structure complements the Hoover Dam with the high-performance concrete arch while limiting the load demands with a modern steel superstructure.
  • The engineering performance needed to withstand the demands of wind, earthquake, and service loads well beyond the codified 75-year life.
  • Sustainability measures included maintaining the water quality of the Colorado River by collecting drainage and conveying it by pipe from the deck to detention areas off the ends of the bridge.
  • The concrete arches and columns are unpainted and concrete surfaces uncoated to provide long-term sustainability, reduce maintenance, and provide an aesthetic consistent with the features of the dam.
  • Changes to the approach alignment helped save 200,000 cubic yards of rock excavation and reduce the project footprint by 15 acres.

Image credit: Jamie Stillings Photography

Markets

Transportation | Bridge

Arch

Services

Engineering and Design

Consulting

XXFacebookFacebookLinkedinLinkedinEmailEmail

Services

  • Bridge design
  • Seismic design
  • Structural engineering
  • Construction engineering
  • Bridge analysis
  • Design services
hoover dam hoover dam hoover dam hoover dam hoover dam Related News 20100730_js_15411_tyl_cc_cropped Sep 27, 2013

Hoover Dam Bypass Receives International Federation of Consulting Engineers (FIDIC) Centenary Award

Awards Innovation book_stack_front_and_back_IMG_9784_cropped_mailchimp May 23, 2013

T.Y. Lin International Wins IABC 2013 Gold Quill Award

Awards 20110114_js_18893_TYLI_small_mailchimp Jan 16, 2013

Hoover Dam Bypass Wins International Road Federation Global Road Achievement Award

Awards Awards International Federation for Structural Concrete (fib) International Federation of Consulting Engineers (FIDIC) American Society of Civil Engineers (ASCE) International Road Federation (IRF) Portland Cement Association (PCA) American Council of Engineering Companies (ACEC) American Council of Engineering Companies (ACEC) International Bridge Conference (IBC) American Segmental Bridge Institute (ASBI) American Road & Transportation Builders Association (ARTBA) National Council of Structural Engineers Association (NCSEA) American Public Works Association (APWA) Bentley Structural Engineers Association of Arizona (SEAoA) American Council of Engineering Companies of Nevada (ACEC-NV) Related Links Hoover Dam Bypass, 2012 ASCE Outstanding Civil Engineering Achievement Award Time Lapse Hoover Dam Bypass Bridge Construction Video from Federal Highway Adm…

Tag » When Was The Bridge Over The Hoover Dam Built