What Is PPAP? Explanation Of The 5 Levels & 18 Requirements

Skip to content PPAP

PPAP ist die Abkürzung fürProduction Part Approval Process (Produktionsteil-Freigabeverfahren)

Our content sections

  • Blog
  • Testimonials
  • Glossary
Newsletter

Glossary article

PPAP Excel-Template

Free of charge | English | Complete

*You hereby agree to us saving and using the data above in order to respond to your enquiry. You can withdraw your agreement at any time by sending an e-mail to [email protected]. You can find additional information in our privacy statement.

Note: Fields marked with (*) are mandatory fields.

FREE PPAP EXCEL-TEMPLATE

PPAP (Production Part Approval Process)

Das Produktionsteil-Freigabeverfahren, kurz  PPAP genannt, dient insbesondere in der Automobilindustrie dazu, die Produktionsprozesse der Zulieferer sowie die Qualität der von ihnen hergestellten Produkte nachzuweisen. In der Praxis fordern beispielsweise Automobilhersteller (OEMs) das PPAP-Freigabeverfahren standardmäßig von ihren Zulieferern ein, um eine gleichbleibende Serienqualität sicherzustellen.

Definition: Die Abkürzung PAPP steht für den englischen Begriff Production Part Approval Process.Im Deutschen steht PAPP für das Produktionsteil-Freigabeverfahren (auch Produktionsteil-Abnahmeverfahren genannt) und ist ein standardisierter Prozess für ein strukturiertes Bemusterungsverfahren für Serienteile.PPAP wird vorallem in der Automobilindustrie eingesetzt.

Der Zweck des Produktionsteil-Freigabeverfahren PPAP besteht darin, dass Lieferanten in einem standardisierten Prozess aufzeigen, dass die Produktanforderungen des Kunden verstanden wurden und in der Serienfertigung Produkte hergestellt werden können, die alle genannten Anforderungen sowie Spezifikation dauerhaft erfüllen.

What is PPAP - FAI

Die Abkürzung PPAP steht für Production Part Approval Process.

Designations and allocation

    • English designation:Production Part Approval Process
    • German designation:Produktionsteil-Freigabeverfahren / Produktionsteil-Abnahmeverfahren
    • Abkürzung:PPAP
  • Verwandte Verfahren:Produktionsprozess- und Produktfreigabe (PPF*)
  • Standardnormen- und Regelwerk:IATF 16949, IS0 9001

⇒ Eine PPAP-Software, wie die FAIR-Software Ideagen Quality Control, umfasst die Dokumentation ihrer Freigabeverfahren nach IATF 16949, VDA2 (PPF), AIAG und DIN EN 9102.

*)Das sogenannte PPF-Verfahren ist wie PPAP eine Vorgehensweise zur Sicherstellung der Qualität, jedoch richtet sich das PPAP-Verfahren nach der amerikanischen Arbeitsgruppe für Lieferantenqualitätsforderungen (AIAG = Automotive Industry Action Group). Wohingegen sich PPF nach der deutschen Automobilindustrie richtet (VDA Band 2).

PPAP

Themenüberblick zum Produktionsteil-Freigabeverfahren PPAP

    • Schaubild zur Produktentstehung – sowie dem damit einhergehenden PPAP-Prozess
    • Teilevorlage-Bestätigung (PSW)
    • PPAP Vorlagestufen (Stufe 1 bis Stufe 5)
    • PPAP-Anforderungen im Detail
    • Inhaltsbestandteile des Produktionsteil-Abnahmeverfahren (PPAP)
    • Difference between PPAP and APQP
    PPF vs. PPAP: Unterschiede zwischen dem PPF-Verfahren und dem PPAP-Prozess finden Sie here. Mit der EMPB-Software Ideagen Quality Control erstellen Sie schnell professionelle Erstmusterpüfberichte. Ideagen Quality Control Software kostenfrei testen!

    Schaubild zur Produktentstehung – sowie dem damit einhergehenden PPAP-Prozess

    Das unten angezeigte Schaubild zur Produktentstehung – sowie dem damit einhergehenden PPAP-Prozess – zeigt wichtige Schritte des Produktionsteil-Freigabeverfahrens im Überblick – beginnend mit der Angebotsphase für ein Bauteil bzw. Produkt über die Produktentwicklung, den Prototypenbau und dessen Prüfung bis hin zur Serienproduktion.

    Das Schaubild zur Produktentstehung können Sie als PDF download free of charge by clicking on the button. The download will open in a new tab.

    Download Graph

    PPAP Process-Production Part Approval Process Chart

    Teilevorlage-Bestätigung (PSW)

    Die Part Submission Warrant (PSW), zu Deutsch Teilevorlage-Bestätigung genannt, stellt einen elementaren Bestandteil des PPAP-Prozesses dar und ist dem Kunden stets mitzusenden. Gemäß dem AIAG PPAP-Handbuch sollten alle Elemente ausgefüllt werden.

    Die Teilevorlage-Bestätigung – im Englischen spricht man von Part Submission Warrant, kurz PSW – ist die formelle Erklärung des Lieferanten, dass alle PPAP-Anforderungen erfüllt sind. Es fasst die gesamte PPAP-Einreichung zusammen und erfordert die Genehmigung des Lieferanten.

    Part Submission Warrant Vorlage (PSW-Vorlage)

    Eine PSW-Vorlage ist im Download unserer kostenfreien "PPAP Excel Template" integrated.

    PSW-PPAP-Part Submission Warrant
    Bemusterungsdeckblatt: Teilevorlagebestätigung (Part Submission Warrant, PSW)

    PPAP Vorlagestufen (Stufe 1 bis Stufe 5)

    Es gibt fünf verschiedene Vorlagestufen, auch Level genannt, welche die Art der Dokumentation für den PPAP-Prozess festlegen, die der Lieferant an den Kunden liefern muss. Die jeweilige Stufe muss in der Teilevorlage-Bestätigung (PSW) entsprechend fixiert werden.

    • Stufe 1 (Level 1)Nur die Teilevorlage-Bestätigung (PSW) wird dem Kunden vorgelegt.⇒ In diesem Fall wird nur das Bemusterungsdeckblatt beim Kunden eingereicht und vorgelegt.
    • Stufe 2 (Level 2)Teilevorlage-Bestätigung (PSW) mit Erstmustern und eingeschränkten unterstützende Daten werden dem Kunden vorgelegt.⇒ Anwendungsfall: Es wird eine Variante eines Produktes produziert, welches bereits in ähnlicher Konstellation bemustert wurde. Der Kunde benötigt in diesem Fall vom Zulieferer nur das PSW-Deckblatt, einige Erstmuster sowie Messberichte von Komponenten, die verändert worden sind.
    • Stufe 3 (Level 3) Teilevorlage-Bestätigung (PSW) mit Erstmustern und vollständig unterstützenden Daten werden dem Kunden vorgelegt.⇒ Stufe 3 kann als „Standardstufe“ bezeichnet werden, da diese Stufe in der Praxis am häufigsten Verwendung findet. Der komplette Bemusterungsumfang ist in diesem Fall erforderlich.
    • Stufe 4 (Level 4) Teilevorlage-Bestätigung (PSW) und andere Forderungen, wie sie vom Kunden festgelegt.⇒ Weitere Dokumente – neben den Anforderungen aus Stufe 3 – sind dem Kunden vorzulegen.
    • Stufe 5 (Level 5) Teilevorlage-Bestätigung (PSW) mit Musterteilen und vollständige unterstützende Daten, werden am Produktionsstandort der Organisation bewertet.⇒ Die Stufe 5 ist die höchste Stufe des Produktionsprozess-Freigabeverfahrens (PPAP), welche eine umfangreiche Prüfung vor Ort einschließt.

    Zusammenfassend kann man sagen, dass die Stufe 1 nur bei kleinen Veränderungen am Produkt zum Einsatz kommt, beispielsweise bei einer geänderten Teilenummer oder bei einer neuen Produktvariante. Der Bemusterungsumfang bei Stufe 1 ist minimal, der Kunde erhält hier nur einen kleinen Einblick in die Dokumentation.

    Im Gegensatz dazu ist der Bemusterungsumfang bei Stufe 3 entsprechend umfangreich. Dem Kunden wird von Anfang ein sehr umfangreicher Einblick in die Produktion gewährt. Von den fünf existierenden Stufen gilt die Stufe 3 als Standardstufe.

    Bei Bemusterungen nach Level 3 bis Level 5 handelt es sich meist um Produktneuentwicklungen oder Produkte mit einem hohen Änderungsumfang. Die entwickelten Produkte spielen in der Regel bei geplanten Fahrzeugen eine sehr wichtige Rolle (A/B-Teile), so dass man durch die umfassende Dokumentation und eine besonders enge Zusammenarbeit Fehlern vorbeugen möchte.

    PPAP-Anforderungen im Detail

    Folgend werden nun 18 mögliche Inhaltsbestandteile des Produktionsteilabnahmeverfahren (PPAP) genauer vorgestellt, erst in Form einer Liste, anschließend werden die PPAP-Forderungen in einzelnen Absätzen noch einmal genauer erläutert. Eine Übersicht der PPAP-Vorlagestufen in der Listenansicht finden Sie weiter unten auch zum Download. 

    • Level
    • Level
    • Level
    • Level
    • Level
    Requirement (Forderung / DE) LevelLevelLevelLevelLevel
    Requirement (Forderung / DE) 1PPAP-Level2PPAP-Level3PPAP-Level4PPAP-Level5PPAP-Level
    1. development documents (Design Records)RSS*R
    - for proprietary components/ details (for proprietary components/ details) RRR*R
    - für alle anderen Bauteile/ Details (for all other components/ details)RSS*R
    2. technical change documents, if available (Engineering Change Documents, if any)RSS*R
    3. technical approval of the customer, if required (Customer Engineering Approval, if required) RRS*R
    4. Design FMEA (Design FMEA)RRS*R
    5. Process Flow Diagrams (Process Flow Diagrams)RRS*R
    6. Process FMEA (Process FMEA)RRS*R
    7. control/production control plan (Control Plan)RRS*R
    8. measurement system analyses (Measurement System Analysis Studies)RRS*R
    9. Dimensional Results (Dimensional Results)RSS*R
    10. Material, Performance Test Results (Material, Performance Test Results)RSS*R
    11. Initial Process Studies (Initial Process Studies)RRS*R
    12. Qualified Laboratory Documentation (Qualified Laboratory Documentation)RSS*R
    13. appearance release report, if applicable (Appearance Approval Report (AAR), if applicable)SSS*R
    14. Sample Product (Sample Product)RSS*R
    15. Master Sample (Master Sample) RRR*R
    16. Checking Aids (Checking Aids)RRR*R
    17. Records of Compliance with Customer-Specific Requirements (Records of Compliance with Customer-Specific Requirements)RRS*R
    18. part template confirmation (Part Submission Warrant (PSW))SSSSS
    - Requirements for process engineering products (Bulk Material Checklist)SSSSS

    Overview table of the PPAP Process Requirements: German and English

    Requirements 1 to 18 and respective the Submission Levels 1 to 5.

    Legend: S | R | *

    • S: Ist dem Kunden vorzulegen und eine Kopie an einem geeigneten Ort aufzubewahren (EN: Submit to the customer and retain a copy at an appropriate location).
    • R: Verbleibt am Herstellungsort und ist dem Kunden auf Wunsch zur Verfügung zu stellen(EN: Retain at manufacturing location and make available to the customer if requested).
    • *: Verbleibt am Herstellungsort und ist dem Kunden auf Wunsch vorzulegen(EN: Retain at manufacturing location and submit to the customer if requested).

    Overview of the PPAP Submission Requirements

    (PPAP Submission Levels Template)

    TABLE: GERMAN - ENGLISH

    PDF-Download

    CLICK HERE PPAP-Submission-Levels-DE-EN-PDF

    Inhaltsbestandteile des Produktionsteil-Abnahmeverfahren (PPAP)

    PPAP-Forderung1. Design Records (Entwicklungsunterlagen)

    „Design Records“ zeigen meist eine Zeichnung des Bauteils, die üblicherweise vom Kunden bereitgestellt wird. Jedes Merkmal der Zeichnung muss gestempelt werden, damit es mit den Prüfergebnissen übereinstimmt. Dazu gehören Notizen, Standardtoleranzinformationen und Spezifikationen sowie alle weiteren Informationen, die für die Entwicklung des Bauteils relevant sind.

    Example: Below is an example of a ballooned part drawing.

    What is PPAP-1. Requirement-Stamped Component Drawing

    Why a copy of the part drawing belongs in your PPAP?It shows the customer that you have a copy of the part drawing and makes sure that you are both discussing the same part.

    Video: Creating a dimensional report for PPAP

    Im folgenden Video zeigen wir Ihnen, wie Sie mit der FAIR-Software Ideagen Quality Control, eine Prüfzeichnung für PPAP erstellen.

    You are currently viewing a placeholder content from Vimeo. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.

    More Information Unblock content Accept required service and unblock content

    PPAP-Forderung2. Engineering Change Documents

    A document showing the detailed description of a change, which is usually called a "technical change note". This document is only required when a change has been made.

    PPAP-Forderung3. Customer Engineering Approval

    This approval is usually the engineering trial with sample production parts performed by the customer. A "temporary deviation" is often required to send parts to the customer before the PPAP is complete. Your customer may require other additional engineering approvals.

    PPAP-Forderung4. Design FMEA

    Design Failure Mode and Effect Analysis (DFMEA) is an application of the Failure Mode and Effects Analysis (FMEA) that is specific to the design stage. The DFMEA allows the design team to document what they predict about a product's potential failures before completing a design and use this information to mitigate the causes of failure. 

    FMEA ist die Abkürzung für Failure Mode and Effects Analysis, im Deutschen spricht man von einer Fehlermöglichkeits- und Einflussanalyse oder kurz Auswirkungsanalyse.

    PPAP-Forderung5. Process Flow Diagrams

    The Process Flow Diagram shows all the steps required in the manufacturing of the part. It should include all of the main steps in the processing of the part including incoming components, measuring, and inspection. The Process Flow Diagram should match the control plan and the Process Failure Mode and Effects Analysis (PFMEA) and also includes the flow of non-conforming materials and parts.

    More information about Ideagen Quality Control? With the FAIR-Software Ideagen Quality Control optimieren Sie Ihre Prüfplanung! Jetzt mehr erfahren

    PPAP-Forderung6. Process FMEA

    Process Failure Mode and Effects Analysis (PFMEA) evaluates each step in the production process to indicate what could go wrong during the fabrication and assembly of each part.

    PPAP-Forderung7. Control Plan

    The Control Plan mirrors the PFMEA (Process Failure Mode and Effects Analysis) and provides more details on how potential issues are checked in the incoming inspection, assembly process, or during the inspection of the finished part.

    PPAP-Forderung8. Measurement System Analysis Studies

    The Measurement Systems Analysis is a study itself and will conform to the customer's relevant ISO or TS standard. Typically it includes the Gauge R&R (Gauge Repeatability and Reproducibility) for the critical characteristics and a confirmation that gauges used to measure these characteristics are calibrated.

    PPAP-Forderung9. Dimensional Results

    A list of all test characteristics stamped on the test mark including the measurement results. The list contains the product property, specification, measurement results and the evaluation showing whether the requirement is "fulfilled" or "not fulfilled" ("Ok" or "Not Ok"). Normally, at least 6 samples per product are tested.Below is an example of a PPAP dimensional inspection results report. Learn more about creating a PPAP dimensional measurement report and how to import measurement results from CMMs into your dimensional inspection results.

    PPAP measurement results - Dimensional Report TestImage: PPAP measurement results (Dimensional Report)

    PPAP-Forderung10. Material, Performance Test Results

    A summary of all tests that have been performed on the part. The summary should document any pass or fail inspection results. It should be signed off by the customer and the supplier to show that all required tests have been done and any additional data for tests have been submitted.

    PPAP-Forderung11. Initial Process Studies

    Generally, this includes SPC (Statistical Process Control) charts for critical characteristics. These studies demonstrate that the critical processes are stable and are ready to begin the process validation builds.

    PPAP-Forderung12. Qualified Laboratory Documentation

    Includes all of the industry certifications for any lab that was involved in completing validation testing.

    PPAP-Forderung13. Appearance Approval Report (AAR)

    The Appearance Approval Report verifies that the customer has inspected the final product and it meets all the required appearance specifications for the design. The report includes color, textures as well as fit (gaps between parts), etc.

    PPAP-Forderung14. Sample Product

    A picture of the production parts is included in the PPAP documentation along with the location where the parts are stored.

    PPAP-Forderung15. Master Sample

    A sample part that is signed off by the customer and supplier. The master part is normally used to train operators on subjective inspections such as visual or for noise.

    PPAP-Forderung16. Checking Aids

    Checking aids are used by production and are a detailed list of all the tools used to inspect test or measure parts during the assembly process. This aid will list the part, describe the tool and have the calibration schedule for the tool.

    PPAP-Forderung17. Records of Compliance with Customer-Specific Requirements

    This section of the PPAP documentation lists requirements of specific industries and the individual requirements of the customer.

    PPAP-Forderung18. Part Submission Warrant (PSW)

    The Part Submission Warrant is a summary of the entire PPAP submission and specifies:

    • Drawing numbers and revisions
    • Information about the part
    • Test results
    • Material declarations numbers
    • Any deviations from earlier elements.

    PPAP Excel-Template

    Free of charge | English | Complete

    *You hereby agree to us saving and using the data above in order to respond to your enquiry. You can withdraw your agreement at any time by sending an e-mail to [email protected]. You can find additional information in our privacy statement.

    Note: Fields marked with (*) are mandatory fields.

    FAI-Software

    Ideagen Quality Control

    50% time saving in FAI-Report generation. Publish FAI-Reports according to VDA, PPAP, AS9102 or custom templates. 

    Free access for 14 days

    Inspection reports in minutes, not hours

    • Free training & support
    • Full functionality
    Get free access

    Difference between PPAP and APQP

    PPAP ist eine Komponente von APQP:.PPAP:Deutsch: Produktionsteil-FreigabeverfahrenEnglisch: Production Part Approval ProcessAPQP:Deutsch: Produkt-Qualitätsvorausplanung und SteuerungsplanEnglisch: Advanced Product Quality Planning

    How does PPAP affect APQP?

    If the PPAP results don't meet customer expectations, that usually means the APQP process isn't working properly. The test for both APQP and PPAP is a production trial run. If the finished trial product includes defective parts, the manufacturer has to go over the supply chain and find out where PPAP or APQP went wrong.

    Related articles:– Was ist APQP (Advanced Product Quality Planning)?– Was ist der Unterschied zwischen PPAP und PPF?– Was ist PPF?– Was ist ein EMPB (Erstmusterprüfbericht)?

    KeyToData Software for Business Logo

    Software distribution for over 25 years

    KeyToData has been distributing highly specialised software for companies in the manufacturing industry since 1995.

    Support without waiting on hold

    We do not leave you alone during the implementation of new software. Even during ongoing software operation, we are always available to answer your questions.

    Selection of our software solutions for companies

    KeyCreator

    CAD/CAM Software

    3DViewstation

    Multi CAD-Viewer

    CAQ System: 1factory

    Quality Control Software

    CrossManager

    CAD converter

    • Software-Solutions
      • All software solutions
      • CAQ System: 1factory
      • 3DViewstation
      • Ideagen Quality Control(formerly InspectionXpert)
      • CrossManager
      • KeyCreator
      • OpenLM
    • Trial versions
      • All test versions
      • Test 1factory
      • Test 3DViewStation
      • Test Ideagen Quality Control
      • Test CrossManager
      • Test KeyCreator
      • Test OpenLM
    • Webinars
    • News
      • Software & Company
      • Newsletter Sign In
    • Service
      • Support
      • Login for customers
      • Glossary
    • Company
      • About us
      • Testimonials
    Nach oben scrollen

    You are currently viewing a placeholder content from Calendly. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.

    More Information Unblock content Accept required service and unblock content More information about the blocked content.

    You are currently viewing a placeholder content from Calendly. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.

    Unblock content Accept required service and unblock content More Information

    You need to load content from reCAPTCHA to submit the form. Please note that doing so will share data with third-party providers.

    More Information Unblock content Accept required service and unblock content

    You are currently viewing a placeholder content from Gymnastics styles. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.

    More Information Unblock content Accept required service and unblock content

    You are currently viewing a placeholder content from Vimeo. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.

    More Information Unblock content Accept required service and unblock content

    You are currently viewing a placeholder content from YouTube. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.

    More Information Unblock content Accept required service and unblock content

    You need to load content from reCAPTCHA to submit the form. Please note that doing so will share data with third-party providers.

    More Information Unblock content Accept required service and unblock content

Tag » What Is A Part Submission Warrant