Available to Promise (ATP)
You can monitor and coordinate customer delivery promises using the available to promise information in the Horizontal Plan window and Planning Detail report. The planning process calculates ATP based on the Calculate ATP item attribute. See: MPS/MRP Planning Attribute Group.ATP is based on a specific MPS, DRP or MRP plan and is non-cumulative. Changes to on-hand quantities, scheduled receipts, and demands made after the planning process is completed are not reflected in ATP until the next time the material plan is executed.
Note: Any ATP calculation done through Oracle Master Scheduling/MRP and Oracle Supply Chain Planning does not consider the ATP rules you define in Oracle Inventory. For instructions on viewing or calculating ATP through Oracle Inventory, see: Viewing ATP Information.
Calculating ATP
Oracle Master Scheduling/MRP and Supply Chain Planning calculates the ATP quantity of an item for each day of planned production by adding planned production during the period (planned orders and scheduled receipts) to the quantity on hand, and then subtracting all committed demand for the period (sales orders, component demand from planned orders, discrete jobs, and repetitive schedules).
Note: Committed demand does not include forecasted demand or manually entered master demand schedule entries. Also, the amount available during each period is not cumulative. Oracle Master Scheduling/MRP and Supply Chain Planning does not consider ATP quantities from prior periods as supply in future periods.
The Available to Promise formula is:
- on hand = nettable quantity on hand
- supply = planned orders, scheduled receipts (purchase orders, purchase requisitions, and discrete jobs), suggested repetitive schedules
- demand = sales orders, component demand (from planned orders, discrete jobs, and suggested repetitive schedules); excludes forecasted demand or manual entries
| Beginning Inventory | Period 1 | Period 2 | Period 3 | Period 4 | |
|---|---|---|---|---|---|
| Forecasts | 20 | 40 | 40 | ||
| Manual Entries | 50 | 40 | 10 | ||
| Sales Orders | 40 | 20 | 50 | ||
| Scheduled Receipts | 110 | 40 | 30 | 50 | |
| Planned Orders | 20 | 50 | |||
| Nettable On Hand | 20 | ||||
| ATP | 110 | 20 | 30 | 50 | |
| Table 1 - 51. MRP Plan for Item A (Page 1 of 1) | |||||
The scheduled receipts (110), planned orders (20), and nettable quantity on hand (20) equal 150 in total supply for period 1. To calculate the total available to promise for period 1, subtract all committed demand from the total supply. The committed demand comes from the following sources: a forecast for 20, a sales order for 40, and a manual entry for 50. Since the forecast and the manual entry are not considered committed demand, but the sales order is, the total committed demand is 40. Therefore, the available to promise is 150 minus 40, or 110 for item B in period 1.
Calculating ATP for Product Family Items
An ATP calculation can be performed at either the product family item level or the member item level. An ATP calculation for the product family item takes into account demand for member items.Depending on the ATP rule specified in Oracle Inventory, the ATP formula for a member item is:
ATP (member item) = MPS (member item) - SO (member item) + WIP jobs (member item) + PO (member item) + On-hand (member item)
The ATP formula for a product family item is:
ATP (member item) = MPS (product family) - SO (all members) + all demand entries specified in the ATP rule for all members
Notice that the ATP calculation for a product family item does not consider supply for member items.
For example, consider a product family item, PF, consisting of member items I1 and I2. The planning percentages are:
- I1: 40%
- I2: 60%
Now assume the following forecast and sales order:
- Forecast: PF (F) 100
- Sales Order: I1 (SO) 10
- Forecast: PF (F) 90
- Forecast: I1 (F) 30
- Forecast: I2 (F) 60
- Schedule: PF (F) 90
- Schedule: PF (SO) 10
- Schedule: I1 (F) 30
- Schedule: I1 (SO) 10
- Schedule: I2 (F) 60
- Plan: PF (F) 90
- Plan: PF (SO) 10
- Plan: I1 (F) 30
- Plan: I1 (SO) 10
- Plan: I2 (F) 60
- ATP: I1 (PF): 100 - 10 = 90 (I1): 40 - 10 + 0 = 30
- ATP: I2 (PF): 100 - 10 = 90 (I2): 60 - 0 + 0 = 60
Negative ATP
If ATP goes negative in a period, it rolls backwards to find ATP from a previous period to cover the demand.Consider the following simple example:
| Beginning Inventory | Period 1 | Period 2 | Period 3 | Period 4 | |
|---|---|---|---|---|---|
| Sales Orders | 100 | 300 | |||
| Scheduled Receipts | 300 | 200 | |||
| ATP (before adjustment) | 200 | -100 | |||
| ATP | 100 | 0 | |||
| Table 1 - 52. Available to Promise (Page 1 of 1) | |||||
The available to promise for period 1 is calculated by subtracting the sales order demand (100) from scheduled receipts (300) giving ATP (200). In period 2, however, when subtracting sales orders (300) from scheduled receipts (200), the initial result is negative ATP (-100). Oracle Master Scheduling/MRP borrows available ATP from the previous period to compensate for the negative quantity.
Inventory Snapshot
Oracle Master Scheduling/MRP and Supply Chain Planning bases ATP information on the:
- snapshot of inventory on hand
- scheduled receipts
- master schedule entries taken during the latest MPS, DRP or MRP plan
Suggestion: You should re-plan the master schedule or material requirements to get the latest ATP information.
Choose whether to display ATP information for an item in the Horizontal Plan window and on the Planning Detail report with the ATP calculation option. Set this option when you define an item.
See Also
Capable to PromiseSupply Chain ATP
Reviewing the Horizontal Plan
Reviewing Current Data
Phases of the Planning Process
Snapshot
Locking Tables within the Snapshot
Locking Tables within the Snapshot Example
Defining Items
Product Families
Calculating Operation Yields
Operation Yields Calculations
| Previous | Next | Contents | Index | Navigation | Glossary | Library |
Từ khóa » Công Thức Mps
-
Xu Hướng Tiết Kiệm Cận Biên (Marginal Propensity To Save) Là Gì?
-
Xu Hướng Tiết Kiệm Cận Biên (Marginal Propensity To ... - VietnamBiz
-
1. Xu Hướng Tiết Kiệm Cận Biên (Marginal Propensity To Save) Là Gì?
-
Công Thức Kinh Tế Vĩ Mô Flashcards | Quizlet
-
[PDF] Thu Nhập Và Chi Tiêu
-
Xu Hướng Tiết Kiệm Cận Biên (Marginal Propensity ...
-
MPS, MRP Và BOM - 3 Trụ Cột Vững Chắc Của Hoạch định Hàng Tồn ...
-
MPS, MRP Và BOM – 3 Yếu Tố Quan Trọng Trong Hoạch định Sản Xuất
-
BÀi Tập Kinh Tế VĨ MÔ B207 (Tờ Rúc) Bài 1 - Quê Hương
-
[PDF] Tổng Cầu Và Ch Chương 4: ầu Và Chính Sách Tài Khóa
-
Marginal Propensity To Save (MPS) Là Gì? - FinanceBiz
-
(PDF) CÔNG THỨC KINH TẾ VĨ MÔ | Trang Quẩy
-
Chương 4 Tổng Cầu Và Chính Sách Tài Khóa Học Phần: Kinh Tế Vĩ Mô