Pb112, Installation Instructions, Parts | Aube Technologies TH115 A ...

background image

PB112

400-112-006-B 1/6/05 1/1

n

One (1) power base

o

Two (2) screws

p

Four (4) solderless connectors for copper wires

NOTE:

Special CO/ALR solderless connectors must be used for connecting

aluminum conductors.

q

One (1) floor sensor and one (1) flat tip screwdriver (F and AF floor heating models only).

Turn off power to the heating system at the main electrical panel toavoid electrical shock. The installation should be carried out by an elec-trician.



High voltage thermostats must be installed onto an electrical box.



For a new installation, choose a location about 5 ft. above the floor andon an inside wall.



The thermostat must be installed on an inside wall facing the heatingsystem (except for floor heating systems).



Avoid locations where there are air drafts (top of staircase, air outlet),dead air spots (behind a door), direct sunlight or concealed chimneys orstove pipes (except for floor heating systems).

n

Connect the power base wires to the power supply and load using sold-erless connectors for copper wires (figure 1).

o

If your thermostat is type F or AF (not A), insert the floor sensor wires through one of the two holes below the terminals (figure 2) and connect the wires to terminals 3 and 4 (no polarity).The wires must run alongside the terminals and not go over them. The wire must not cross any heating wires nor be placed directly on a heating wire or adjacent to it. For best performance, the sensor probe should be centered between the wires in the mat.

p

If you wish to use a remote controller such as the CT240 or CT241, insert the cable (use 18 to 22 gauge flexible wires) into one of the two holes available below the terminal board and connect to terminals 1 and 2 of the base (figure 2).

q

Push the excess length of the high-voltage wires back into the electrical box.

r

Secure the power base to the electrical box using the provided screws.

s

If necessary, set the configuration switches on the control module (refer to the control module user guide).

t

Install the control module onto the base.

u

Apply power to heating system.

Storage

: -4°F to 120°F (-20°C to 50°C)

Remote controller input (ECONO)

: requires a dry contact

Size (H • W • D)

: 4.89 x 2.76 x 0.91 in. (124 x 70 x 23 mm)

Certifications

:

n

Parts

1.

o

Guidelines

2.

p

Procedure

3.

q

Technical Specifications

4.

Model

Supply

Max. Load

Power

Wiring

GFCI

120GA

120 VAC, 50/60Hz

15 A

1800 W

4w/DP

5 mA

120GB

120 VAC, 50/60Hz

15 A

1800 W

4w/DP

30 mA

120S

120 VAC, 50/60Hz

16.7 A

2000 W

4w/SP

240GA

240 VAC, 50/60Hz208 VAC, 50/60Hz

15 A

3600 W3120 W

4w/DP

5 mA

240GB

240 VAC, 50/60Hz208 VAC, 50/60Hz

15 A

3600 W3120 W

4w/DP

30 mA

240S

240 VAC, 50/60Hz208 VAC, 50/60Hz

16.7 A

4000 W3475 W

4w/SP

240D

240 VAC, 50/60Hz208 VAC, 50/60Hz

15 A

3600 W3120 W

4w/DP

Power

Load

Figure 1

Figure 2

Models:

120 GA / GB

240 GA / GB

Models:

120S / 240S240D

PB112

Installation Instructions

For models: 120GA / 120GB / 120S / 240GA / 240GB / 240S / 240D

Từ khóa » Pb112c-gb