Start Or Stop Service - San Patricio Electric Cooperative
Có thể bạn quan tâm
Welcome to SPEC!
We are owned by the people we serve, so when you sign up for electric service with us, you’re signing up to be a member of our cooperative. And being a member has its perks! To get started, fill out an application below, download a pdf version of our membership application or call us at 888-740-2220.
Residential
New Service for a Residence
Start New ServiceBusiness
New Service for a Business
Start New ServiceHelpful Tips for New Service
New Member with an Existing Line or MeterIf you’re new to the SPEC service area and need to start service at an existing home or business, follow these instructions:
-
Fill out a Membership Application and return it to San Patricio Electric Cooperative, Inc., PO Drawer 400, Sinton, TX 78387, Fax to 361-364-3467 or email us.
-
If service is currently disconnected to the meter, you’ll need to know your 911 address to start service. Check here for instructions on how to obtain your 911 address.
-
Ensure a deposit or a letter of credit is on file with the Cooperative, if necessary.
-
Complete a tax exempt form.
-
Contact SPEC at 361-364-2220 or 888-740-2220 to connect your new meter. Please have the location of the new meter available.
If you’re new to the SPEC service area and need to start electric service for a newly constructed home or business, follow these directions:
-
Review the Checklist for New Customers
-
Fill out a Membership Application and return it to San Patricio Electric Cooperative, Inc. by mail: PO Drawer 400, Sinton, TX 78387; Fax: 361-364-3467 or email.
-
Review and sign the New Service Procedures
-
Complete a Load Survey Sheet
-
Load Survey - Residential
-
Load Survey - Non-Residential
-
-
The landowner must complete an Electric Line Easement , which you will obtain from SPEC
-
Follow the instructions on the 911 Address Contacts and Development Permit Contacts form to obtain the appropriate documentation.
-
The right-of-way must be clean & cleared 30' wide.
-
Ensure the construction cost is paid.
-
Confirm that a deposit or a letter of credit is on file with the Cooperative, if necessary.
-
Complete a tax exempt form.
-
Make certain the meter loop is built and at the construction site for inspection. Contact SPEC for the Meter Loop requirements.
After completion of the paperwork is received at the Cooperative and monies are paid, new line construction should take between 2-3 weeks.
We would love your feedback. Once your new lines are set up, please fill out a report card to let us know how the experience was for you.
Existing Member with Existing Line or MeterIf you’re already a San Patricio Electric Cooperative member and need to start electric service at an existing meter, please follow these directions:
-
Complete an additional service request.
-
Contact SPEC at 1-361-364-2220 or 1-888-740-2220 to connect your new meter. Please have available your current account number and the location of the new meter.
-
Ensure a deposit or a letter of credit is on file with the Cooperative, if necessary.
-
Consider adding HaloFlight's Guardian Subscription Plan to your monthly bill for just $1 per month.
If you’re already a SPEC member, but you need to start electric service at a newly constructed home or business, follow these directions.
-
Complete an additional service request.
-
Review the Checklist for New Customers
-
Review and sign the New Service Procedure Sheet
-
Complete a Load Survey Sheet
-
Load Survey- Residential
-
Load Survey - Non-Residential
-
Landowner must complete an Electric Line Easement - Obtain from SPEC
-
Follow the instructions on the 911 Address Contacts and Development Permit Contacts to obtain the appropriate documentation.
-
The right-of-way must be clean & cleared 30' wide.
-
Ensure the Construction Cost is paid.
-
Confirm that a deposit or a letter of credit is on file with the Cooperative, if necessary.
-
Make certain the meter loop is built and at the construction site for inspection. Contact SPEC for the Meter Loop requirements.
-
Consider adding HaloFlight's Guardian Subscription Plan to your monthly bill for just $1 per month.
After completion of the paperwork is received at the Cooperative and monies are paid, new line construction should take between 2-3 weeks.
Existing Member with New BusinessIf you are already a SPEC member and have opened a business in our service area, you don't have to start a whole new application for service to your business. Instead, fill out this Additional Service request form.
Stop Service
We're sorry to see you go! Remember, you'll still receive capital credit checks in the future based on your electricity use during your time as a SPEC member. Simply fill out the form below to stop your service, and provide a forwarding address. If you are stopping service for a deceased person or want to transfer your service, please contact us at 361-364-2220 or 888-740-2220 (toll free).
Stop Service©2025 San Patricio Electric Cooperative. All Rights Reserved.
Powered by Co-op Web Builder
- My Account
- Account Management
- Stop or Start Service
- SmartHub
- Outdoor Lighting Program
- Critical Care & Critical Load
- Tax Exempt Forms
- Your Electric Bill
- Understand Your Bill
- Payment Options
- Payment Assistance Programs
- Rates
- Residential Rates
- Business Rates
- Service Fees
- Electrician Services
- Electrician Services
- Meter Loop Diagrams
- GenerLink Transfer Switches
- Account Management
- Outages & Safety
- Outages
- Report an Outage
- Outage Map
- Electricity Safety
- Electricity Safety
- Storm Safety Tips
- Call Before You Dig
- Energy Education
- Electricity 101
- School Safety Program
- Kids Energy Zone
- Outages
- Energy Solutions
- Energy Savings
- Home Efficiency Checkup
- Energy Savings Tips
- Renewable Energy
- Renewable Energy
- Renewable Energy Rate
- Generators
- Generator Program
- Energy Savings
- Member Perks
- Youth Programs
- Youth Tour
- SPEC Scholarship
- Member Benefits
- Capital Credits
- Annual Meeting
- HALO-Flight
- Valuable Discounts
- Co-op Connections Program
- Youth Programs
- About SPEC
- Cooperative Information
- About SPEC
- Service Area
- Electricity Sources
- Community Service
- Our History
- Careers
- Leadership Team
- Frequently Asked Questions
- Contact Us
- Governance
- Board of Directors
- Bylaws and Member Information
- News
- Co-op News
- Cooperative Information
Từ khóa » Http://sanpatricioelectric.org
-
San Patricio Electric Cooperative: Home
-
Legal Information - San Patricio Electric Cooperative
-
SPEC Scholarship | San Patricio Electric Cooperative
-
San Patricio Electric Cooperative - Home - Facebook
-
San Patricio Electric Cooperative - Sinton, TX - Yelp
-
San Patricio Electric Cooperative, Inc. Scholarship
-
San Patricio Electric Cooperative Login - Bill Payment Online
-
San Patricio Electric Cooperative Sinton, TX 78387 - Yellow Pages
-
▷ Home | San Patricio Electric Cooperative
-
San Patricio Electric Cooperative Bill Pay, Online Login, Customer ...
-
San Patricio Electric Cooperative - Sinton, United States