Ferry Pier Langeoog/Bensersiel - SEE-Ingenieure GmbH & Co.KG
Ferry pier Langeoog/Bensersiel
» back
Client: | Island Community of Langeoog |
Orderer: | Shipping of Island Community of Langeoog |
Scope of services:
- Object and structural planning acc. HOAI 2013 LPH 1-5, 6 pro rata
- Planning of technical equipment (only propulsion systems) acc. HOAI 2013 LPH 1-3
Object description:
Approx. 250,000 tourists visit the North Sea island of Langeoog every year. The supply of the island community of Langeoog (approx. 2,000 permanent residents) for general economic and tourist reasons thus places high demands on the superstructure. For these reasons, it was decided to construct new, identical pedestrian and container bridges in the ports of Bensersiel and Langeoog as part of a replacement measure. These enable safe boarding and disembarking or loading and unloading of the ferries. The difference in height between the ferry and the quay caused by the tide is compensated for by means of a lifting bridge construction. The necessary height compensation of the ramps is carried out by electromechanical drives (ELC).
Từ khóa » Hoai 2013 Lph 1
-
HOAI Leistungsphasen: Bauphasen 1-9 Auf
-
HOAI 2013: Volltext Online Auf
-
HOAI) Anlage 1 (zu § 3 Absatz 1) Weitere Fachplanungs
-
Anlage 10 HOAI - (zu § 34 Absatz 4, § 35 Absatz 7)
-
Anlage 14 HOAI - (zu § 51 Absatz 5, § 52 Absatz 2)
-
Leistungsphasen Nach HOAI - Wikipedia
-
[PDF] HOAI 2013 Honorarordnung Für Architekten Und Ingenieure ... - BDIA
-
HOAI 2013 | So Sieht Die Neue Prozent-Verteilung Der ... - IWW Institut
-
Motorway A96, Enclosure Germering - Project Details - SSF Ingenieure
-
D 15 - Renewal Of The BAB A30 AS Rheine Nord - Export Opportunities
-
[PDF] HOAI 2013 Erweiterter Grundleistungskatalog Freianlagen Merkblatt 5
-
[PDF] HOAI TGA 2013 - IRG Berlin
-
Service Phases According To HOAI - Second.wiki